One of three sites located in mid Russia with packaged 1.5MW power generating plant for an oil exploration company. Each unit included noise attenuation, exhaust silencers, control panels and pre-installed fuel/oil systems. Special steel and welding techniques were adopted to satisfy temperature variants between -40°C to +40°C. A purpose designed variable speed drive fan cooling system was used to overcome the harsh environment.


We package equipment into purpose-made, pre-fabricated containers, modules or enclosures designed to protect the equipment and employees in challenging locations and climates.

Our packaging service includes the comprehensive mechanical and electrical installation of customers’ equipment to high specifications, and can also cover full electrical testing, if required.

For example, we can despatch very large, heavy generator sets to the customer with all fuel-pipe, exhaust, and radiator connectors complete, and fuel lines completed with fusible link fire drop valves and spill detection. The work is carried out in our purpose-built facility by our own skilled engineers. For customers, it’s a highly cost-effective and efficient alternative to packaging their own equipment.

Mechanical and electrical installation equipment includes:

HV, MV switchgear, vacuum and SF-6
LV switchgear / MCC
DC traction switchgear
Generators
Compressors
Conventional and intelligent system
Power transformers
Power factor correction (PFC)
Variable speed drives (VSDs)
DC battery systems
AC UPS Systems
DCS, ESD, F&G, I/O, MOV control panels.

Further options:

Fuel pipe work
Lagging
Bellows
Bus bar boxes
Power cabling
Control cabling
Fire detection/suppression
Witness testing.

Installation service key points:

All equipment is laid out in orderly fashion, with safe working clearance in front and behind
Each section is securely bolted down to the steel floor structure using the equipment’s standard fixing arrangements
Provisions are made through the floor and/or wall for all field cable penetration (bolt-on gland plates/transit frames)
An overhead cable management system is provided to carry all internal interconnecting equipment cabling
All installations meet the highest standards, and any associated site specific requirements
All work is undertaken at Bradgate’s Leicestershire site, including test prior to despatch to site.